202 1.2mm 201 Stainless Steel Sheet 2b Finished SS Metal Sheet Baosteel
Product Details:
Place of Origin: | China |
Brand Name: | Tisco /Bao steel |
Certification: | SGS ISO MTC |
Model Number: | 202 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1000 KG |
---|---|
Price: | 1.3USD/KG |
Packaging Details: | Seaworthy wooden pallet or according to client's requirement |
Delivery Time: | 7-15 working days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 500 Tons/Month |
Detail Information |
|||
Grade: | 202 | Standard: | ASTM, JIS, AISI |
---|---|---|---|
Thickness: | Cold Rolled:0.3mm-3.0mm Hot Rolled:3.0mm-100mm | Length: | 1000mm-2000mm Or As Customer's Requires. |
Surface: | BA/2B/NO.1/NO.3/NO.4/8K/HL/2D/1D | Price Term: | CIF CFR FOB EX-WORK |
Sample: | Free Sample | Application: | Industry,Kitchenware.Construction |
High Light: | stainless steel plain sheet,stainless flat sheet |
Product Description
202 1.2mm stainless steel sheet 2b finished SS metal sheet baosteel
202 stainless steel is widely used in building decoration, municipal engineering, highway guardrail, hotel
facilities, shopping malls, glass handrails, public facilities and other places.
200 series stainless steel belongs to low nickel high manganese stainless steel, nickel content, manganese
content of about 8%, is the section of nickel stainless steel.
Grade | 202 stainless steel sheet |
Edge | Mill edge/Slit edge |
MOQ | 1 ton |
Price term | FOB/CIF /CFR |
Payment term | T/T,L/C
30% byT/T in advance and 70% payment before delivery |
Delivery time | 5-10 days,Based on stock and order quantity |
Packing | Standard Sea-worthy Packing |
Product pictures
FAQ
Q1: Are you trading company or manufacturer ?
A: We are factory for processing service and have own houseware.
Q2: How long is your delivery time?
A: Generally it is 3-7 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is
according to quantity.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What are your payment terms?
A: Our payment method is 30% byT/T and 70% payment before delivery.